-
Transfer Station / Recycling Centre
Environment CanterburyTransfer Stations / Recycling Centres in the Canterbury Region.Created 1 October 2023 • Updated 3 February 2025 -
Flood protection vegetation boundary (Flood Protection and Drainage Bylaw...
Environment CanterburyThis layer was amended in January 2019. A draft boundary line shows areas of vegetation retained under the Soil Conservation and Rivers Control Act (1941). A desired boundaryline showsareas where it would be beneficial to increase the vegetated buffer width to the land side so that a consistent protective buffer can be achieved. In some cases, on the...Created 1 October 2023 • Updated 3 February 2025 -
Stopbanks (Flood Protection and Drainage Bylaw 2013 - amended 2019)
Environment CanterburyThis layer was amended in January 2019 Stopbanks (Flood Protection and Drainage Bylaw 2013). The Flood Protection and Drainage Bylaw was made operative on 2 April 2013 and provides for the ongoing management and effective operation of flood protection and drainage works that are owned or controlled by Environment Canterbury. These include drainage...Created 1 September 2022 • Updated 3 February 2025 -
Stopbanks - 20m exclusion (Flood Protection and Drainage Bylaw 2013 - amended 2019)
Environment CanterburyThis layer was amended in January 2019 Stopbanks - 20 m exclusion (Flood Protection and Drainage Bylaw 2013) The Flood Protection and Drainage Bylaw was made operative on 2 April 2013 and provides for the ongoing management and effective operation of flood protection and drainage works that are owned or controlled by Environment Canterbury. These include...Created 1 September 2022 • Updated 3 February 2025 -
Floodways (Flood Protection and Drainage Bylaw 2013 - amended 2019)
Environment CanterburyThis layer was amended in January 2019 Floodways as defined in the Flood Protection and Drainage Bylaw 2013. See RMA definition of riverbed and NRRP guidance 6.2 2 2. Generally, a river bed line shows the outside toe of the stopbank where there are stopbanks (provided the stopbank is of a sufficient standard), a terrace, or, where there are no well-...Created 1 September 2022 • Updated 3 February 2025 -
Drains and watercourses (Flood Protection and Drainage Bylaw 2013 - amended 2019)
Environment CanterburyThis layer was amended in January 2019. This dataset has been created from the a georeferenced plans and Engineering knowledge of the drains that the Regional Council manages and maintains through out the region. Note equipment used by the regional council needs at most 7.5m strip alongside the drain. Buffering of 10m has been added so as to alleviate any...Created 1 October 2023 • Updated 3 February 2025 -
Surface Water Allocation Zones
Environment CanterburyThis dataset has no description
Created 1 October 2023 • Updated 3 February 2025 -
LPRP - Area B (Gollans Bay Quarry Area)
Environment CanterburyArea B (Gollans Bay Quarry Area) as defined in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te Hapū o Ngāti...Created 1 October 2023 • Updated 3 February 2025 -
LPRP - Te Awaparahi Bay Exisiting Consented Reclamation
Environment CanterburyTe Awaparahi Bay Existing Consented Reclamation as shown in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te...Created 1 September 2022 • Updated 3 February 2025 -
Canterbury Water Management Strategy Zones
Environment CanterburyCanterbury Water Management Strategy Zones previously known as the State of Environment (SOEM) Management Zones for water charging.Created 1 October 2023 • Updated 3 February 2025 -
ECan Lakes
Environment CanterburyIntended Use This layer shows lakes for the Canterbury region that have been categorised into Water Quality Management Units and Classes, or Lake Type, defined in the Canterbury Land and Water Regional Plan (LWRP) and various regional plans. Layers were digitised to cadastral accuracy (1:10,000 scale), but recommended use is at the 1:50,000 scale or...Created 1 September 2022 • Updated 3 February 2025 -
Groundwater Quality Zones
Environment CanterburyIntended Use The Groundwater Quality Zones layer shows all zones with quality limits for the Canterbury region that have been defined in the Canterbury Land and Water Regional Plan (LWRP) and various regional plans. This layer compiles several zone types from different plans, including: groundwater provinces, groundwater allocation zones, nitrate...Created 1 September 2022 • Updated 3 February 2025 -
Groundwater Allocation Zones
Environment CanterburyIntended Use The Groundwater Allocation Zones layer collates zones for regulating groundwater use and allocation as defined in the Canterbury Land and Water Regional Plan (LWRP) and various regional plans. This includes groundwater allocation zones, groundwater management zones, and combined surface water and groundwater zones. Layers were digitised to...Created 1 September 2022 • Updated 3 February 2025 -
Water Supply
Environment CanterburyWater supply networks in the Canterbury Region.For the Ashburton Water Supply data, please visit this Ashburton LocalMaps.Created 1 September 2022 • Updated 3 February 2025 -
LPRP - Area A (Port Land Use Area)
Environment CanterburyArea A (Port Land Use Area) as defined in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te Hapū o Ngāti...Created 1 September 2022 • Updated 3 February 2025 -
LPRP - Area A - Reclamation and Wharf Structures
Environment CanterburyArea A - Reclamation and Wharf Structures as defined in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te...Created 1 September 2022 • Updated 3 February 2025 -
LPRP - Dredging Spoil Dumping Grounds
Environment CanterburyDredging Spoil Dumping Grounds as defined in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te Hapū o Ngāti...Created 3 September 2024 • Updated 3 February 2025 -
LPRP - Enlarged Main Navigation Channel Coordinates
Environment CanterburyEnlarged Main Navigation Channel Coordinates as shown in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te...Created 1 October 2023 • Updated 3 February 2025 -
LPRP - Historic Main Navigation Channel
Environment CanterburyHistoric Main Navigation Channel as defined in the Lyttelton Port Recovery Plan. The Lyttelton Port Recovery Plan provides for the repair, rebuild and reconfiguration of Lyttelton Port and the redevelopment of Dampier Bay. It also establishes how transport issues and construction effects will be managed, and directs Environment Canterbury, Te Hapū o Ngāti...Created 1 September 2022 • Updated 3 February 2025 -
Earthworks and Vegetation Clearance
Environment CanterburyLayer from Land and Vegetation Management Regional Plan by Canterbury Regional Council 1997, which addresses the management of earthworks and vegetation clearance in the Port Hills. It forms Part 1 of a series of four documents addressing various aspects of land and vegetation throughout the Canterbury Region.Created 1 September 2022 • Updated 3 February 2025